2012-2013 Science Planning Summaries
U.S. Antarctic Program - Science Support Section United States Antarctic Program United States Antarctic Program Logo National Science Foundation Logo
 
NASA Long Duration Balloon (LDB) support program
 

Program Manager:
Dr. Vladimir Papitashvili

A-145-M
NSF/NASA Agreement

ASC POC/Implementer:
Addie Coyac / Brian Johnson

Mr. Bill Stepp (Principal Investigator)
Bill.Stepp@csbf.nasa.gov
http://www.csbf.nasa.govExternal U.S. Government Site

Columbia Scientific Balloon Facility
Palestine, Texas

Supporting Stations:  McMurdo Station
Research Locations:  LDB Facility at Williams Field

Project Description:
This austral summer, the Columbia Scientific Balloon Facility (CSBF) will launch three stratospheric balloons as part of NASA’s Long Duration Balloon (LDB) program. The balloons measure 400 feet in diameter, expand to a volume of 40 million cubic feet, and ascend at a rate of about 900 feet per minute to a float altitude of 125,000 feet. The payloads are composed of scientific instruments, command and control systems, and solar and/or battery-powered units. The bulk of the data collected is stored on onboard hard drives, with a small amount sent by radio telemetry to the United States. Because of the Antarctic wind pattern that starts in early December, the balloons will circumnavigate Antarctica between 70 and 80 degrees south latitude.

Field Season Overview:
This year’s science payloads are Shaul Hananay’s E and B Experiment (EBEX, A-146), Mark Devlin’s Balloon-borne Large Aperture Sub-millimeter Telescope (BLAST, A-147), and Walter Binns’ SuperTIGER (A-142). The project teams are housed at McMurdo and commute to the Williams Field launch facility. Balloons are rigged and payloads are prepared in advance so they can launch as soon as weather and wind patterns permit. Upon termination of the flights, recovery teams use fixed-wing and/or helicopter support to retrieve the instrument and its parachute. A contract camp manager, equipment operator, cook and general assistant (GA) are assigned to the facility. Each year, the prime contractor’s facility maintenance division sets up and takes down the camp buildings. The operations division prepares the launch pad, maintains the roads, and services the generators.

Deploying Team Members:

  • Alexander Beange
  • Curtis Frazier
  • Gerald Gregg
  • Jack Hays
  • Jim Humphrey
  • Otto Masters
  • Dwayne Orr
  • Gerald Orr
  • Jacob Richard

Return to Science Planning Summary Indexes Return to top of page Print this Page

Project Indexes
Find information about current USAP projects using the principal investigator, event number station, and other indexes.
Project Search
Looking for a particular project? Search by project title, or project team member here.
2012-2013 Field Season other information: Station Schedules Air Operations Staffed Field Camps Event Numbering System
Share on Facebook Share on Twitter Share on Google Plus Share This Site on Pinterest Subscribe to USAP RSS Feeds Share Via Email
Curator: Esther L. Hill PhD, Antarctic Support Contract   |   NSF Official: Alexandra Isern, Division of Polar Programs