Logistics
United States Antarctic Program United States Antarctic Program Logo National Science Foundation Logo
Alert
Read the latest information from NSF on coronavirus (COVID-19)
 
Intercontinental Airlift and Continental Sealift Schedule

The following documents are password protected and share the same username and password as the Antarctic Air Operations Planning Summary. If you require access, please send an email to AirSeaSchedule@usap.gov.

Latest Intercontinental Airlift/Sealift Calendar - Revised January 02, 2024 
Latest Peninsula Airlift/Sealift Calendar - Revised July 27, 2021

back to top
Air Operations Manual

Download the Air Operations Manual below.

Air Operations Manual

back to top
Antarctic Air Operations Planning Summary

The following document is password protected and shares the same username and password as the Intercontinental Airlift Schedule. If you require access, please send an email to AirSeaSchedule@usap.gov.

2021-2022 Air Operations Planning Summary
Air Operations Addendum for Imagery and Maps

back to top
2020-2021 USAP Transportation Summary
Frozen Loader at South Pole Station
Frozen Loader at South
Pole Station.

The 2020-2021 USAP Transportation Summary includes seven sections. Each document is password protected and shares the same username and password as the Intercontinental Airlift Schedule. If you require access, please send an email to AirSeaSchedule@usap.gov.

Section 1: Intercontinental Airlift
Section 2: South Pole Airlift
Section 3: Inland Camps Airlift
Section 4: Commercial Transport
Section 5: Vessel Operations
Section 6: Christchurch Operations
Section 7: McMurdo Shuttle Operations

For information pertaining to previous seasons, see the USAP Transportation Summary Archives.

back to top
Shipping Information